Who makes large power transformers (345–765 kv) & substations for AI data centers
constrained
Grid-scale transformers and switchyards that step transmission voltage down to what a data center campus can use, plus the substation civil works around them.
The substation and its transformers are the physical interconnect between the utility transmission grid and the campus, converting transmission voltage down to the range that HV switchgear and downstream MV distribution can handle. Everything inside the fence — HV switchgear, MV switchgear and E-houses, transformers all the way down to the rack — depends on this equipment being on site and energized before load can be added. Because a large power transformer is a custom-engineered, long-lead unit built to a specific voltage, MVA, and impedance spec, and because global manufacturing capacity for the core steel and windings involved is tight, transformer availability rather than construction speed increasingly sets the pace at which a campus can bring capacity online. For investors, the things to watch are supplier order books and backlog length, how much manufacturing capacity incumbents are adding versus how much new entrants can qualify, and whether utilities or developers begin pre-ordering transformers speculatively ahead of a firm interconnection to protect their place in the queue. Substation equipment also tends to require utility-grade qualification and testing, which limits how quickly a new supplier can be brought in even once it has capacity.
AI delta: lead times of 2–4 years; the single biggest schedule risk for GW campuses.
Companies on this part (18)
| Company | Role | Ownership | Ticker | Price | 1d | Confidence | Note |
|---|---|---|---|---|---|---|---|
| CG Power | manufacturer | public | CGPOWER.NS | 898 INR | +3.8% | inferred | |
| Efacec · unit of Mutares | manufacturer | subsidiary | MUX.DE* | inferred | |||
| GE Vernova | manufacturer | public | GEV | 954 USD | -2.2% | inferred | |
| Hitachi Energy · unit of Hitachi | manufacturer | subsidiary | 6501.T* | inferred | |||
| Hyosung Heavy | manufacturer | public | 298040.KS | 3098000 KRW | +0.9% | inferred | |
| Hyundai Electric | manufacturer | public | 267260.KS | 801000 KRW | -2.1% | inferred | |
| Končar | manufacturer | public | KOEI.ZG | ⚠ | inferred | ||
| LS Electric | manufacturer | public | 010120.KS | 213500 KRW | -2.3% | inferred | |
| Mitsubishi Electric | manufacturer | public | 6503.T | 5641 JPY | +1.0% | inferred | |
| Prolec GE · unit of Xignux/GEV | manufacturer | subsidiary | inferred | ||||
| Siemens Energy | manufacturer | public | ENR.DE | 150 EUR | -0.6% | inferred | |
| TBEA | manufacturer | public | 600089.SS | 19.36 CNY | -0.1% | inferred | |
| WEG | manufacturer | public | WEGE3.SA | 50.25 BRL | -0.3% | inferred | |
| Delta Star | manufacturer | private | inferred | ||||
| Pennsylvania Transformer | manufacturer | private | inferred | ||||
| SGB-SMIT | manufacturer | private | inferred | ||||
| Toshiba | manufacturer | private | inferred | ||||
| Virginia Transformer | manufacturer | private | inferred |
Who competes here
The same table read the other way: every company above competes for large power transformers (345–765 kv) & substations sockets. Confidence tags matter — an inferred placement is a lead, not a confirmed rivalry.
Nearby parts
Watch
Independent videos — no affiliation; nothing loads from YouTube until you click.
Latest feed
- US Army selects 5 companies to deploy microreactors at military installations — Utility Dive, 2026-08-27Federal funding is allocating $2.2B to support the deployment of microreactors at military installations, enhancing site resilience and next-generation nuclear power viability.
Sources: placements without a source URL come from the taxonomy seed and are tagged accordingly. How this data is built.· Markdown · JSON