Part of the day: Large power transformers (345–765 kV) & substations

Assembled by the nightly build from this catalog’s own entry for Large power transformers (345–765 kV) & substations (7.01, Layer 7 — Electrical: power distribution (grid to rack)). The tables below are rebuilt every night; published 2026-10-24.

Grid-scale transformers and switchyards that step transmission voltage down to what a data center campus can use, plus the substation civil works around them.

The substation and its transformers are the physical interconnect between the utility transmission grid and the campus, converting transmission voltage down to the range that HV switchgear and downstream MV distribution can handle. Everything inside the fence — HV switchgear, MV switchgear and E-houses, transformers all the way down to the rack — depends on this equipment being on site and energized before load can be added. Because a large power transformer is a custom-engineered, long-lead unit built to a specific voltage, MVA, and impedance spec, and because global manufacturing capacity for the core steel and windings involved is tight, transformer availability rather than construction speed increasingly sets the pace at which a campus can bring capacity online. For investors, the things to watch are supplier order books and backlog length, how much manufacturing capacity incumbents are adding versus how much new entrants can qualify, and whether utilities or developers begin pre-ordering transformers speculatively ahead of a firm interconnection to protect their place in the queue. Substation equipment also tends to require utility-grade qualification and testing, which limits how quickly a new supplier can be brought in even once it has capacity.

AI delta: lead times of 2–4 years; the single biggest schedule risk for GW campuses.

Who makes it

Large power transformers (345–765 kV) & substations (7.01 — full page)
CompanyRoleOwnershipTickerPrice1dConfidenceNote
CG PowermanufacturerpublicCGPOWER.NS813 INR-0.5%inferred
Efacec · unit of MutaresmanufacturersubsidiaryMUX.DE*inferred
GE VernovamanufacturerpublicGEV815 USD-1.0%inferred
Hitachi Energy · unit of Hitachimanufacturersubsidiary6501.T*disclosed · source
Hyosung Heavymanufacturerpublic298040.KS1877000 KRW-1.9%inferred
Hyundai Electricmanufacturerpublic267260.KS470000 KRW-3.5%inferred
KončarmanufacturerpublicKOEI.ZG ⚠inferred
LS Electricmanufacturerpublic010120.KS156900 KRW-2.2%inferred
Mitsubishi Electricmanufacturerpublic6503.T4770 JPY-2.3%inferred
Prolec GE · unit of Xignux/GEVmanufacturersubsidiaryinferred
Siemens EnergymanufacturerpublicENR.DE119 EUR-2.0%disclosed · source
TBEAmanufacturerpublic600089.SS17.65 CNY+1.9%inferred
WEGmanufacturerpublicWEGE3.SA42.73 BRL-3.2%inferred
Delta Starmanufacturerprivateinferred
Pennsylvania Transformermanufacturerprivatedisclosed · source
SGB-SMITmanufacturerprivateinferred
Toshibamanufacturerprivateinferred
Virginia Transformermanufacturerprivateinferred
Competing on Large power transformers (345–765 kV) & substations:CG Power inferred, Efacec inferred, GE Vernova inferred, Hitachi Energy disclosed, Hyosung Heavy inferred, Hyundai Electric inferred, Končar inferred, LS Electric inferred, Mitsubishi Electric inferred, Prolec GE inferred, Siemens Energy disclosed, TBEA inferred, WEG inferred, Delta Star inferred, Pennsylvania Transformer disclosed, SGB-SMIT inferred, Toshiba inferred, Virginia Transformer inferred

The full entry — sub-categories, news, videos and sources — lives on the Large power transformers (345–765 kV) & substations page.