xAI Colossus

Memphis, Tennessee, US · operating · operated for xAI

xAI's GPU supercluster for training Grok, built inside a former Electrolux appliance factory in south Memphis and famous for its build speed: the first 100,000 GPUs came online in 122 days. A second campus (Colossus 2) is under construction nearby.

Compute Atlas, the sister dataset on supercomputer and AI-cluster supply chains, has the component-by-component record for this campus: xAI Colossus (system) · xAI Colossus 2 (system).

What's documented

Suppliers reported inside

CompanyWhatSource
Supermicroliquid-cooled GPU racks (reported as more than half of them)source
DellAI-optimized servers (tens of thousands, reported)source
NvidiaH100/H200/GB200 GPUs, Spectrum-X switching, BlueField-3 SuperNICssource
TeslaMegapack battery storagesource

Placements come from the cited reporting, not operator disclosures, unless a source says otherwise.

The generic bill of materials

Whatever the vendor list, a facility like this contains the same part categories:rack-scale systems, direct-to-chip cold plates, coolant distribution units, large power transformers (345–765 kV) & substations, UPS (static, modular, rotary/DRUPS) & UPS power semis, backup generation: gensets, fuel systems, HVO, chillers & compressors — the full set is in the scales matrix.

Sources: nvidianews.nvidia.com · introl.com · teslarati.com · mississippifreepress.org