Accton (Edgecore) is a publicly listed company and based in Taiwan. It appears on 2 parts of the AI data center — Switch systems & white-box ODMs and Data center developers, operators & REITs — in the roles of odm and developer. Those parts sit in Layer 3 — Networking & interconnect and Layer 9 — Building shell, site & construction. Its shares trade on Taiwan Stock Exchange as 2345.TW.
Parts, by layer
Layer 3 — Networking & interconnect
| Part | Role | Confidence | Competitors | Note |
|---|---|---|---|---|
| Switch systems & white-box ODMs | odm | inferred | Quanta Computer, Alpha Networks, Arista, Celestica, Cisco, Dell |
Layer 9 — Building shell, site & construction
| Part | Role | Confidence | Competitors | Note |
|---|---|---|---|---|
| Data center developers, operators & REITs | developer | inferred | AdaniConneX, Applied Digital, Cipher, CleanSpark, Core Scientific, Digital Realty | region: US |
Where Accton sits in the stack
Accton's placements in this catalog cover 2 parts, from layer 3 (networking & interconnect) to layer 9 (building shell, site & construction). None of them currently carries a sourced supply constraint tag. Across these parts it overlaps with other companies most often on the lines below.
What these parts are
- Switch systems & white-box ODMs — The physical switches — built by branded vendors and white-box ODMs — that house scale-out switch ASICs and connect racks into a cluster fabric.
- Data center developers, operators & REITs — The companies that own, develop, and operate the physical data center buildings AI workloads run in, from public REITs and colocation operators to private developers and bitcoin miners that have pivoted to AI hosting.
Closest peers in this catalog
Monthly revenue (TWSE/TPEx filing)
| Month | Revenue (TWD m) | MoM | YoY |
|---|---|---|---|
| 2026-09 | 40,399 | -1.2% | 66.1% |
| 2026-08 | 40,873 | 3.5% | 59.4% |
| 2026-07 | 39,473 | -0.2% | 71.7% |
| 2026-06 | 39,555 | 38.2% | 61.2% |
| 2026-05 | 28,623 | 4.6% | 56.6% |
| 2026-04 | 27,360 | 9.4% | 53.9% |
| 2026-03 | 25,011 | 6.0% | 44.4% |
| 2026-02 | 23,583 | 9.5% | 82.7% |
| 2026-01 | 21,527 | -17.4% | 71.9% |
| 2025-12 | 26,053 | 15.5% | 67.7% |
| 2025-11 | 22,554 | -3.5% | 79.7% |
| 2025-10 | 23,365 | -3.9% | 114.7% |
Questions about Accton (Edgecore)
- What does Accton (Edgecore) make for AI data centers?
- This catalog places Accton (Edgecore) on 2 parts: Switch systems & white-box ODMs (odm) and Data center developers, operators & REITs (developer).
- Is Accton (Edgecore) publicly traded?
- Yes — Accton (Edgecore) is listed on Taiwan Stock Exchange under 2345.TW. Prices shown on this page are a nightly snapshot, not real-time, and nothing here is investment advice.
- Where is Accton (Edgecore) based?
- Taiwan, per the company record in this catalog.
- Who else makes switch systems & white-box ODMs for AI data centers?
- Quanta Computer, Alpha Networks, Arista, Celestica, Cisco and Dell are also placed on Switch systems & white-box ODMs in this catalog.
- How well sourced are these placements?
- Every part→company placement carries a confidence tag. For Accton (Edgecore) the mix is 2 inferred. "disclosed" means the company or a filing says so; "reported" comes from trade press or a reference-design list; "inferred" is a lead from the taxonomy with no citation yet. Treat reported and inferred as leads, not facts.