<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0">
<channel>
<title>Fusion</title>
<link>https://gridtochip.site/parts/power-generation-and-energy-supply/fusion-long-dated-ppas</link>
<description>News and posts about Fusion on GridToChip</description>
<item>
<title>Number of data center fires and power failures has doubled since 2024</title>
<link>https://www.datacenterdynamics.com/en/news/number-of-data-center-fires-and-power-failures-has-doubled-since-2024</link>
<pubDate>Mon, 12 Oct 2026 10:14:22 GMT</pubDate>
<description>Data from the Energy Incident Register shows a significant increase in fire and power failure incidents related to power infrastructure since 2024. (Data Center Dynamics)</description>
</item>
<item>
<title>PPPL Partners on Genesis Mission Project to Build AI Digital Twin for Fusion Energy</title>
<link>https://www.hpcwire.com/off-the-wire/pppl-partners-on-genesis-mission-project-to-build-ai-digital-twin-for-fusion-energy</link>
<pubDate>Fri, 09 Oct 2026 02:58:28 GMT</pubDate>
<description>PPPL is partnering on the Genesis Mission Project to develop an AI-powered digital twin for fusion energy. (HPCwire)</description>
</item>
<item>
<title>China's 'BEST' fusion reactor enters the engineering endgame</title>
<link>https://www.digitimes.com/news/a20261001VL210/plasma-supply-chain.html</link>
<pubDate>Thu, 01 Oct 2026 06:20:00 GMT</pubDate>
<description>China's 'BEST' fusion reactor has reached the engineering phase of its development. (DigiTimes)</description>
</item>
<item>
<title>PPPL Links STELLAR-AI with UK Fusion Supercomputer Under Genesis Mission</title>
<link>https://www.hpcwire.com/off-the-wire/pppl-links-stellar-ai-with-uk-fusion-supercomputer-under-genesis-mission</link>
<pubDate>Mon, 14 Sep 2026 19:52:03 GMT</pubDate>
<description>A proposed federation plans to link PPPL’s STELLAR-AI with the UKAEA’s AI supercomputing platform to accelerate fusion energy research. (HPCwire)</description>
</item>
<item>
<title>AI server exports to US slow; electronics parts jump 1.5 times in August</title>
<link>https://www.digitimes.com/news/a20260910PD202/exports-taiwan-electronics-2025-ai-server.html</link>
<pubDate>Sun, 13 Sep 2026 00:23:08 GMT</pubDate>
<description>Taiwan reported that electronic parts exports reached a record high of $32.22 billion in August 2026, with integrated circuits and printed circuit boards seeing significant growth. (DigiTimes)</description>
</item>
<item>
<title>The eleven parts that only show up above hyperscale</title>
<link>https://gridtochip.site/blog/parts-that-only-exist-at-campus-scale</link>
<pubDate>Wed, 09 Sep 2026 00:00:00 GMT</pubDate>
<description>Eleven of this catalog's 130 part categories never appear below campus scale. Ten of them are power. One is optics.</description>
</item>
<item>
<title>Exclusive: Taiwan's first tokamak to begin plasma testing by end of 2026</title>
<link>https://www.digitimes.com/news/a20260831PD236/design-development-nuclear-fusion-taiwan-testing-worldwide.html</link>
<pubDate>Fri, 04 Sep 2026 23:55:46 GMT</pubDate>
<description>Taiwan's first tokamak is scheduled to start plasma testing by the end of 2026, highlighting the ongoing technical challenges in achieving commercial fusion power. (DigiTimes)</description>
</item>
<item>
<title>The further you get from the chip, the less of the supply chain is listed</title>
<link>https://gridtochip.site/blog/listed-share-by-layer</link>
<pubDate>Wed, 02 Sep 2026 00:00:00 GMT</pubDate>
<description>652 of the 1,164 companies on a part here are listed: 87% of the rack layer, 41% of the building shell, and four parts with no listed supplier at all.</description>
</item>
<item>
<title>The 17 parts where only one listed company shows up</title>
<link>https://gridtochip.site/blog/one-listed-supplier-parts</link>
<pubDate>Tue, 01 Sep 2026 00:00:00 GMT</pubDate>
<description>A query for parts with exactly one publicly listed supplier returns 17 rows. Every one of those 17 edges is an unsourced lead — which is the actual finding.</description>
</item>
</channel>
</rss>