<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0">
<channel>
<title>MV/LV transformers</title>
<link>https://gridtochip.site/parts/electrical-power-distribution-grid-to-rack/mv-lv-transformers-pad-mount-dry-type</link>
<description>News and posts about MV/LV transformers on GridToChip</description>
<item>
<title>Tata Power eyes 2.8GW of generation, transmission, and distribution for Indian data center sector</title>
<link>https://www.datacenterdynamics.com/en/news/tata-power-eyes-28gw-of-generation-transmission-and-distribution-for-indian-data-center-sector</link>
<pubDate>Wed, 21 Oct 2026 15:40:44 GMT</pubDate>
<description>Tata Power plans to secure significant generation, transmission, and distribution capacity for the burgeoning Indian data center industry. (Data Center Dynamics)</description>
</item>
<item>
<title>Hitachi Energy teams up with Ansaldo to develop integrated power solutions for data center sector and grid</title>
<link>https://www.datacenterdynamics.com/en/news/hitachi-energy-teams-up-with-ansaldo-to-develop-integrated-power-solutions-for-data-center-sector-and-grid</link>
<pubDate>Wed, 21 Oct 2026 10:35:52 GMT</pubDate>
<description>Hitachi Energy and Ansaldo have formed a collaboration to develop integrated power solutions specifically for the data center sector and the broader electrical grid. (Data Center Dynamics)</description>
</item>
<item>
<title>LS Power COO sees sweeping power sector investing needs: gas, renewables, transmission and more</title>
<link>https://www.utilitydive.com/news/ls-power-gas-renewables-transmission-equity-fund/833466</link>
<pubDate>Tue, 20 Oct 2026 14:40:35 GMT</pubDate>
<description>LS Power's COO stated that current demand growth is substantial and that the supply side of the power infrastructure, including gas, renewables, and transmission, requires significant time to meet market needs. (Utility Dive)</description>
</item>
<item>
<title>Microsoft abandons UK AI supercomputer as grid struggles to keep up</title>
<link>https://www.theregister.com/on-prem/2026/10/19/microsoft-abandons-uk-ai-supercomputer-as-grid-struggles-to-keep-up/5303824</link>
<pubDate>Mon, 19 Oct 2026 12:15:48 GMT</pubDate>
<description>Microsoft has withdrawn from its planned UK AI supercomputer because power grid connection issues are expected to delay the nation's AI infrastructure goals until the 2030s. (The Register)</description>
</item>
<item>
<title>Microsoft signs 20-year power deal with Indiana utility NiSource for planned data center in the state</title>
<link>https://www.datacenterdynamics.com/en/news/microsoft-signs-20-year-power-deal-with-indiana-utility-nisource-for-planned-data-center-in-the-state</link>
<pubDate>Mon, 19 Oct 2026 09:49:00 GMT</pubDate>
<description>Microsoft has secured a 20-year power agreement with the utility NiSource to support a planned data center facility in Indiana. (Data Center Dynamics)</description>
</item>
<item>
<title>TECO targets AI data center growth with energy storage, transformers</title>
<link>https://www.digitimes.com/news/a20261015PD201/teco-data-center-ess-taiwan.html</link>
<pubDate>Sat, 17 Oct 2026 00:06:33 GMT</pubDate>
<description>TECO Electric and Machinery showcased its smart microgrid solutions and future plans for its power and energy business group at Energy Taiwan. (DigiTimes)</description>
</item>
<item>
<title>LEO satellite boom strains supply chain amid AI data-center demand</title>
<link>https://www.digitimes.com/news/a20261015PD205/leo-supply-chain-data-materials-capacity.html</link>
<pubDate>Thu, 15 Oct 2026 02:00:42 GMT</pubDate>
<description>The simultaneous expansion of LEO satellite constellations and AI data centers is creating supply chain strain and competition for power-related equipment and grid capacity. (DigiTimes)</description>
</item>
<item>
<title>Taisic Materials expands SiC capacity for AI data centers, 8-inch markets</title>
<link>https://www.digitimes.com/news/a20261012PD243/taisic-sic-kenmec-data-development.html</link>
<pubDate>Tue, 13 Oct 2026 08:10:00 GMT</pubDate>
<description>Taisic Materials is expanding its Silicon Carbide (SiC) production capacity to serve the power electronics and electrical equipment needs of AI data centers. (DigiTimes)</description>
</item>
<item>
<title>Number of data center fires and power failures has doubled since 2024</title>
<link>https://www.datacenterdynamics.com/en/news/number-of-data-center-fires-and-power-failures-has-doubled-since-2024</link>
<pubDate>Mon, 12 Oct 2026 10:14:22 GMT</pubDate>
<description>Data from the Energy Incident Register shows a significant increase in fire and power failure incidents related to power infrastructure since 2024. (Data Center Dynamics)</description>
</item>
<item>
<title>Breaking the AI Infrastructure Power Wall: From Grid to xPU</title>
<link>https://www.eetimes.com/breaking-the-ai-infrastructure-power-wall-from-grid-to-xpu</link>
<pubDate>Thu, 08 Oct 2026 12:36:33 GMT</pubDate>
<description>The report discusses the critical infrastructure requirements for AI hardware, specifically focusing on the electrical grid, power transformers, and the shift toward high-voltage DC architectures and onsite power generation. (EE Times)</description>
</item>
<item>
<title>CPC, Taipower pay premiums to secure energy supplies, face financial strain</title>
<link>https://www.digitimes.com/news/a20260923PD243/taiwan-power-company-fuel-war-2026-electricity.html</link>
<pubDate>Fri, 25 Sep 2026 00:57:50 GMT</pubDate>
<description>Taiwanese power providers (CPC and Taipower) are absorbing high energy costs and facing financial strain to stabilize domestic prices due to geopolitical tensions and falling shipping volumes. (DigiTimes)</description>
</item>
<item>
<title>FERC rejects ComEd’s cancellation of PowerHouse Hillwood data center contract</title>
<link>https://www.utilitydive.com/news/ferc-exelon-comed-powerhouse-hillwood-data-center/831127</link>
<pubDate>Wed, 23 Sep 2026 13:45:55 GMT</pubDate>
<description>FERC scrutinized a low letter of credit provided for a large planned 1.8-GW data center contract by PowerHouse Hillwood. (Utility Dive)</description>
</item>
<item>
<title>Zeo Energy and Ewyze partner on off-grid power solutions for US data center sector</title>
<link>https://www.datacenterdynamics.com/en/news/zeo-energy-and-ewyze-partner-on-off-grid-power-solutions-for-us-data-center-sector</link>
<pubDate>Wed, 23 Sep 2026 09:25:57 GMT</pubDate>
<description>Zeo Energy and Ewyze are partnering to provide off-grid power solutions for data centers in the US, with an eye toward international expansion. (Data Center Dynamics)</description>
</item>
<item>
<title>NVIDIA Announces DSX Ready Qualification Program for Data Center Power and Cooling Hardware</title>
<link>https://www.servethehome.com/nvidia-announces-dsx-ready-qualification-program-for-data-center-power-and-cooling-hardware</link>
<pubDate>Tue, 22 Sep 2026 15:00:58 GMT</pubDate>
<description>NVIDIA launched the DSX Ready program, a qualification standard for data center power and cooling hardware used in AI data center construction. (ServeTheHome)</description>
</item>
<item>
<title>Kodiak Gas Services to supply 76MW of behind-the-meter gas power to West Texas data center</title>
<link>https://www.datacenterdynamics.com/en/news/kodiak-gas-services-to-supply-76mw-of-behind-the-meter-gas-power-to-west-texas-data-center</link>
<pubDate>Mon, 21 Sep 2026 15:16:10 GMT</pubDate>
<description>Kodiak Gas Services will provide 76MW of natural gas-fueled power directly to a data center in West Texas. (Data Center Dynamics)</description>
</item>
<item>
<title>Wiwynn chair says AI hardware is being reshaped by power, cooling, interconnect demands</title>
<link>https://www.digitimes.com/news/a20260921PD201/cooling-hardware-wiwynn-taiwan-infrastructure.html</link>
<pubDate>Mon, 21 Sep 2026 03:04:23 GMT</pubDate>
<description>AI infrastructure demands are reshaping global hardware design, forcing focus on power, cooling, and high-speed interconnect solutions. (DigiTimes)</description>
</item>
<item>
<title>Pricing future megawatts: the growing role of earnouts in data center M&amp;A</title>
<link>https://www.datacenterdynamics.com/en/opinions/pricing-future-megawatts-the-growing-role-of-earnouts-in-data-center-ma</link>
<pubDate>Sun, 20 Sep 2026 10:27:00 GMT</pubDate>
<description>The article discusses the increasing use of earnouts in mergers and acquisitions (M&amp;A) concerning data center power capacity. (Data Center Dynamics)</description>
</item>
<item>
<title>Hitachi to double US production of small and medium-sized power transformers</title>
<link>https://www.utilitydive.com/news/hitachi-to-double-us-production-of-small-and-medium-sized-power-transformer/830762</link>
<pubDate>Fri, 18 Sep 2026 12:42:36 GMT</pubDate>
<description>Hitachi will double the US production capacity of small to medium-sized power transformers (10 MVA to 160 MVA) at a Mississippi facility. (Utility Dive)</description>
</item>
<item>
<title>EPA scraps Biden power plant GHG rules, moves to eliminate other standards</title>
<link>https://www.utilitydive.com/news/epa-scraps-biden-power-plant-ghg-rules-moves-to-eliminate-other-standards/830433</link>
<pubDate>Tue, 15 Sep 2026 17:00:17 GMT</pubDate>
<description>The Edison Electric Institute, representing investor-owned utilities, supported the repeal of carbon capture and storage standards implemented by the EPA. (Utility Dive)</description>
</item>
<item>
<title>Change 4 mindsets to build a more resilient US grid: NERC CEO Jim Robb</title>
<link>https://www.utilitydive.com/news/grid-infrastructure-transmission-data-center-ai-nerc-robb/829592</link>
<pubDate>Tue, 15 Sep 2026 14:49:27 GMT</pubDate>
<description>NERC CEO Jim Robb argues that building new power infrastructure requires overcoming ingrained mindsets, not just dealing with physical challenges. (Utility Dive)</description>
</item>
<item>
<title>Taiwan's Ministry of Economic Affairs shares power grid experience at APEC Energy Ministerial Meeting</title>
<link>https://www.digitimes.com/news/a20260914PD247/taiwan-apec-moea-industrial-development.html</link>
<pubDate>Tue, 15 Sep 2026 03:57:19 GMT</pubDate>
<description>Taiwan shared its strategy for maintaining stable power supply to support high-tech industrial growth, particularly in response to AI and global energy shifts. (DigiTimes)</description>
</item>
<item>
<title>Samsung, SK Hynix reject US$19 billion power prepayment as Korea speeds chip expansion</title>
<link>https://www.digitimes.com/news/a20260914VL218/samsung-sk-hynix-expansion-electricity-infrastructure.html</link>
<pubDate>Mon, 14 Sep 2026 08:24:52 GMT</pubDate>
<description>Samsung and SK Hynix refused a massive power prepayment proposal, emphasizing the difficulty of financing the power infrastructure required for accelerating semiconductor expansion in South Korea. (DigiTimes)</description>
</item>
<item>
<title>Mexican cartel's crypto farm seized in mountain raid — 300 GPUs, satellite links, and industrial transformers tapped hydroelectric power</title>
<link>https://www.tomshardware.com/tech-industry/cryptomining/mexican-cartel-crypto-farm-seized-in-mountain-raid-300-gpus-satellite-links-and-industrial-transformers-tapped-hydroelectric-power</link>
<pubDate>Sun, 13 Sep 2026 11:30:00 GMT</pubDate>
<description>Cartels in Mexico are reportedly entering crypto mining by seizing hardware like GPUs, transformers, and tapping hydroelectric power. (Tom's Hardware)</description>
</item>
<item>
<title>AI server exports to US slow; electronics parts jump 1.5 times in August</title>
<link>https://www.digitimes.com/news/a20260910PD202/exports-taiwan-electronics-2025-ai-server.html</link>
<pubDate>Sun, 13 Sep 2026 00:23:08 GMT</pubDate>
<description>Taiwan reported that electronic parts exports reached a record high of $32.22 billion in August 2026, with integrated circuits and printed circuit boards seeing significant growth. (DigiTimes)</description>
</item>
<item>
<title>Taiwan sees AI-era power upgrade openings in France</title>
<link>https://www.digitimes.com/news/a20260911PD231/taiwan-france-europe-president-demand.html</link>
<pubDate>Sat, 12 Sep 2026 01:13:31 GMT</pubDate>
<description>Taiwanese companies are exploring energy and power infrastructure upgrades in France through trade delegations focused on grid security and energy resilience. (DigiTimes)</description>
</item>
</channel>
</rss>