<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0">
<channel>
<title>LV cable, wire, tray, raceway</title>
<link>https://gridtochip.site/parts/electrical-power-distribution-grid-to-rack/lv-cable-wire-tray-raceway</link>
<description>News and posts about LV cable, wire, tray, raceway on GridToChip</description>
<item>
<title>Tata Power eyes 2.8GW of generation, transmission, and distribution for Indian data center sector</title>
<link>https://www.datacenterdynamics.com/en/news/tata-power-eyes-28gw-of-generation-transmission-and-distribution-for-indian-data-center-sector</link>
<pubDate>Wed, 21 Oct 2026 15:40:44 GMT</pubDate>
<description>Tata Power plans to secure significant generation, transmission, and distribution capacity for the burgeoning Indian data center industry. (Data Center Dynamics)</description>
</item>
<item>
<title>Malaysia says data center investors must fund transmission upgrades</title>
<link>https://www.digitimes.com/news/a20261020VL211/data-center-transmission-capacity-cost-investment.html</link>
<pubDate>Tue, 20 Oct 2026 03:35:00 GMT</pubDate>
<description>Malaysia is requiring data center investors to fund necessary transmission upgrades, increasing the link between investment and local grid capacity. (DigiTimes)</description>
</item>
<item>
<title>FERC approves ISO-NE ‘asset condition’ transmission review process</title>
<link>https://www.utilitydive.com/news/ferc-iso-ne-asset-condition-transmission-review/833328</link>
<pubDate>Mon, 19 Oct 2026 13:20:51 GMT</pubDate>
<description>FERC approved an 'asset condition' transmission review process that commissioners suggested other regions should adopt for increased oversight of local transmission projects. (Utility Dive)</description>
</item>
<item>
<title>LEO satellite boom strains supply chain amid AI data-center demand</title>
<link>https://www.digitimes.com/news/a20261015PD205/leo-supply-chain-data-materials-capacity.html</link>
<pubDate>Thu, 15 Oct 2026 02:00:42 GMT</pubDate>
<description>The simultaneous expansion of LEO satellite constellations and AI data centers is creating supply chain strain and competition for power-related equipment and grid capacity. (DigiTimes)</description>
</item>
<item>
<title>DCD Studio: Powering data centers at scale with Hans Obermillacher, Panduit</title>
<link>https://www.datacenterdynamics.com/en/videos/dcd-studio-powering-data-centers-at-scale-with-hans-obermillacher-panduit</link>
<pubDate>Wed, 14 Oct 2026 17:25:00 GMT</pubDate>
<description>Panduit's Hans Obermillacher discusses the impact of AI-driven demand on data center infrastructure, including geographic shifts to the Nordic region and the necessity of scalable power and cabling solutions. (Data Center Dynamics)</description>
</item>
<item>
<title>DCD Studio: Manufacturing power systems with Michael Beagan, TES Power</title>
<link>https://www.datacenterdynamics.com/en/videos/dcd-studio-manufacturing-power-systems-with-michael-beagan-tes-power</link>
<pubDate>Wed, 14 Oct 2026 16:27:27 GMT</pubDate>
<description>The discussion covers the importance of switchgear, power distribution, and modular power solutions for accelerating data center construction. (Data Center Dynamics)</description>
</item>
<item>
<title>Google data center strategic sourcing exec heads to OpenAI</title>
<link>https://www.datacenterdynamics.com/en/news/google-data-center-strategic-sourcing-exec-heads-to-openai</link>
<pubDate>Tue, 13 Oct 2026 16:26:47 GMT</pubDate>
<description>Google's strategic sourcing executive is joining OpenAI to focus on high-speed interconnects and rack power infrastructure. (Data Center Dynamics)</description>
</item>
<item>
<title>Sponsored: VEIR raises $110 million Series C to accelerate commercialization of superconducting power delivery technology for AI data centers</title>
<link>https://www.datacenterdynamics.com/en/product-news/veir-raises-110-million-series-c-to-accelerate-commercialization-of-superconducting-power-delivery-technology-for-ai-data-centers</link>
<pubDate>Tue, 13 Oct 2026 08:00:00 GMT</pubDate>
<description>Veir raised $110 million in Series C funding to scale the manufacturing and deployment of superconducting power delivery systems designed for high-density AI data centers. (Data Center Dynamics)</description>
</item>
<item>
<title>Number of data center fires and power failures has doubled since 2024</title>
<link>https://www.datacenterdynamics.com/en/news/number-of-data-center-fires-and-power-failures-has-doubled-since-2024</link>
<pubDate>Mon, 12 Oct 2026 10:14:22 GMT</pubDate>
<description>Data from the Energy Incident Register shows a significant increase in fire and power failure incidents related to power infrastructure since 2024. (Data Center Dynamics)</description>
</item>
<item>
<title>Breaking the AI Infrastructure Power Wall: From Grid to xPU</title>
<link>https://www.eetimes.com/breaking-the-ai-infrastructure-power-wall-from-grid-to-xpu</link>
<pubDate>Thu, 08 Oct 2026 12:36:33 GMT</pubDate>
<description>The report discusses the critical infrastructure requirements for AI hardware, specifically focusing on the electrical grid, power transformers, and the shift toward high-voltage DC architectures and onsite power generation. (EE Times)</description>
</item>
<item>
<title>Sponsored: Beyond power availability: What makes a data center project power-ready</title>
<link>https://www.datacenterdynamics.com/en/marketwatch/beyond-power-availability-what-makes-a-data-center-project-power-ready</link>
<pubDate>Mon, 28 Sep 2026 07:00:00 GMT</pubDate>
<description>Modern data center power readiness assessment has shifted from simply confirming available power to evaluating the credibility of the project and the guaranteed delivery timeline. (Data Center Dynamics)</description>
</item>
<item>
<title>Uncle Sam coughs up $1.9B for grid upgrades as datacenters hit a power wall</title>
<link>https://www.theregister.com/systems/2026/09/25/uncle-sam-coughs-up-19b-for-grid-upgrades-as-datacenters-hit-a-power-wall/5299276</link>
<pubDate>Fri, 25 Sep 2026 19:26:34 GMT</pubDate>
<description>The U.S. government funding for grid upgrades is expected to enable at least 23 gigawatts of additional power capacity for data centers. (The Register)</description>
</item>
<item>
<title>DOE unveils $1.9bn in funding for 31 grid upgrade projects to speed data center connections</title>
<link>https://www.datacenterdynamics.com/en/news/doe-unveils-19bn-in-funding-for-31-grid-upgrade-projects-to-speed-data-center-connections</link>
<pubDate>Fri, 25 Sep 2026 09:35:19 GMT</pubDate>
<description>The Department of Energy announced $1.9 billion in funding for 31 grid upgrade projects to increase data center connectivity capacity. (Data Center Dynamics)</description>
</item>
<item>
<title>California tightens oversight of data center energy use, grid costs</title>
<link>https://www.utilitydive.com/news/california-tightens-oversight-of-data-center-energy-use-grid-costs/831037</link>
<pubDate>Tue, 22 Sep 2026 14:53:40 GMT</pubDate>
<description>New state regulations passed in California mandate that data centers contribute financially to necessary infrastructure, wildfire mitigation, and liability costs. (Utility Dive)</description>
</item>
<item>
<title>Texas PUC adopts softened rules on data center interconnection</title>
<link>https://www.utilitydive.com/news/texas-puc-adopts-data-center-interconnection-rules/830899</link>
<pubDate>Mon, 21 Sep 2026 15:00:57 GMT</pubDate>
<description>The Texas Public Utility Commission revised its proposed interconnection rules by removing a non-refundable fee, reducing financial security requirements, and extending deadlines for energization. (Utility Dive)</description>
</item>
<item>
<title>New York regulators approve 90-mile transmission line</title>
<link>https://www.utilitydive.com/news/new-york-psc-propel-transmission-line/830866</link>
<pubDate>Mon, 21 Sep 2026 12:55:13 GMT</pubDate>
<description>New York regulators approved a $3.3-billion transmission line project to boost downstate power delivery by 2030. (Utility Dive)</description>
</item>
<item>
<title>Pricing future megawatts: the growing role of earnouts in data center M&amp;A</title>
<link>https://www.datacenterdynamics.com/en/opinions/pricing-future-megawatts-the-growing-role-of-earnouts-in-data-center-ma</link>
<pubDate>Sun, 20 Sep 2026 10:27:00 GMT</pubDate>
<description>The article discusses the increasing use of earnouts in mergers and acquisitions (M&amp;A) concerning data center power capacity. (Data Center Dynamics)</description>
</item>
<item>
<title>Power grids can't keep pace with AI data center boom in EU, US</title>
<link>https://www.digitimes.com/news/a20260918PD206/aidc-eu-cost-supply-chain-electricity.html</link>
<pubDate>Fri, 18 Sep 2026 23:20:07 GMT</pubDate>
<description>AI data center cost estimates are inaccurate because they often overlook the full expense of power generation, transmission, and grid infrastructure, leading to significant regional cost variations. (DigiTimes)</description>
</item>
<item>
<title>Change 4 mindsets to build a more resilient US grid: NERC CEO Jim Robb</title>
<link>https://www.utilitydive.com/news/grid-infrastructure-transmission-data-center-ai-nerc-robb/829592</link>
<pubDate>Tue, 15 Sep 2026 14:49:27 GMT</pubDate>
<description>NERC CEO Jim Robb argues that building new power infrastructure requires overcoming ingrained mindsets, not just dealing with physical challenges. (Utility Dive)</description>
</item>
<item>
<title>Taiwan's Ministry of Economic Affairs shares power grid experience at APEC Energy Ministerial Meeting</title>
<link>https://www.digitimes.com/news/a20260914PD247/taiwan-apec-moea-industrial-development.html</link>
<pubDate>Tue, 15 Sep 2026 03:57:19 GMT</pubDate>
<description>Taiwan shared its strategy for maintaining stable power supply to support high-tech industrial growth, particularly in response to AI and global energy shifts. (DigiTimes)</description>
</item>
<item>
<title>AI server exports to US slow; electronics parts jump 1.5 times in August</title>
<link>https://www.digitimes.com/news/a20260910PD202/exports-taiwan-electronics-2025-ai-server.html</link>
<pubDate>Sun, 13 Sep 2026 00:23:08 GMT</pubDate>
<description>Taiwan reported that electronic parts exports reached a record high of $32.22 billion in August 2026, with integrated circuits and printed circuit boards seeing significant growth. (DigiTimes)</description>
</item>
<item>
<title>Taiwan sees AI-era power upgrade openings in France</title>
<link>https://www.digitimes.com/news/a20260911PD231/taiwan-france-europe-president-demand.html</link>
<pubDate>Sat, 12 Sep 2026 01:13:31 GMT</pubDate>
<description>Taiwanese companies are exploring energy and power infrastructure upgrades in France through trade delegations focused on grid security and energy resilience. (DigiTimes)</description>
</item>
<item>
<title>Eighteen companies cross four layers of this stack. 984 never leave one.</title>
<link>https://gridtochip.site/blog/suppliers-that-cross-layers</link>
<pubDate>Thu, 03 Sep 2026 00:00:00 GMT</pubDate>
<description>984 of the 1,163 companies on a part here sit in exactly one of the eleven layers. Eighteen reach four or more, and two pairs occupy identical parts.</description>
</item>
<item>
<title>SB Energy eyes US listing as Nvidia commits US$1.5 billion</title>
<link>https://www.digitimes.com/news/a20260902PD228/data-center-infrastructure-ipo-nvidia.html</link>
<pubDate>Wed, 02 Sep 2026 23:32:26 GMT</pubDate>
<description>SB Energy filed for an IPO, potentially valued over $50 billion, with significant backing promised by Nvidia's $1.5 billion investment. (DigiTimes)</description>
</item>
<item>
<title>Macronix boosts sustainability spending to NT$780 million</title>
<link>https://www.digitimes.com/news/a20260902PD200/2025-macronix-international-water-2024-fab.html</link>
<pubDate>Wed, 02 Sep 2026 23:28:44 GMT</pubDate>
<description>Macronix reported that it achieved significant reductions in greenhouse gas emissions and committed to investing NT$780 million in sustainability initiatives for 2025. (DigiTimes)</description>
</item>
</channel>
</rss>