<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0">
<channel>
<title>Busway / busbar trunking</title>
<link>https://gridtochip.site/parts/electrical-power-distribution-grid-to-rack/busway-busbar-trunking</link>
<description>News and posts about Busway / busbar trunking on GridToChip</description>
<item>
<title>Tata Power eyes 2.8GW of generation, transmission, and distribution for Indian data center sector</title>
<link>https://www.datacenterdynamics.com/en/news/tata-power-eyes-28gw-of-generation-transmission-and-distribution-for-indian-data-center-sector</link>
<pubDate>Wed, 21 Oct 2026 15:40:44 GMT</pubDate>
<description>Tata Power plans to secure significant generation, transmission, and distribution capacity for the burgeoning Indian data center industry. (Data Center Dynamics)</description>
</item>
<item>
<title>Hitachi Energy teams up with Ansaldo to develop integrated power solutions for data center sector and grid</title>
<link>https://www.datacenterdynamics.com/en/news/hitachi-energy-teams-up-with-ansaldo-to-develop-integrated-power-solutions-for-data-center-sector-and-grid</link>
<pubDate>Wed, 21 Oct 2026 10:35:52 GMT</pubDate>
<description>Hitachi Energy and Ansaldo have formed a collaboration to develop integrated power solutions specifically for the data center sector and the broader electrical grid. (Data Center Dynamics)</description>
</item>
<item>
<title>LS Power COO sees sweeping power sector investing needs: gas, renewables, transmission and more</title>
<link>https://www.utilitydive.com/news/ls-power-gas-renewables-transmission-equity-fund/833466</link>
<pubDate>Tue, 20 Oct 2026 14:40:35 GMT</pubDate>
<description>LS Power's COO stated that current demand growth is substantial and that the supply side of the power infrastructure, including gas, renewables, and transmission, requires significant time to meet market needs. (Utility Dive)</description>
</item>
<item>
<title>Grid equipment manufacturer ABB sees US orders rise 82%</title>
<link>https://www.utilitydive.com/news/grid-equipment-manufacturer-abb-sees-us-orders-rise-82/833452</link>
<pubDate>Tue, 20 Oct 2026 13:28:57 GMT</pubDate>
<description>ABB reported that utility investments are increasing for electrical grid refurbishment and build-out to ensure power availability and efficiency. (Utility Dive)</description>
</item>
<item>
<title>LEO satellite boom strains supply chain amid AI data-center demand</title>
<link>https://www.digitimes.com/news/a20261015PD205/leo-supply-chain-data-materials-capacity.html</link>
<pubDate>Thu, 15 Oct 2026 02:00:42 GMT</pubDate>
<description>The simultaneous expansion of LEO satellite constellations and AI data centers is creating supply chain strain and competition for power-related equipment and grid capacity. (DigiTimes)</description>
</item>
<item>
<title>DCD Studio: Manufacturing power systems with Michael Beagan, TES Power</title>
<link>https://www.datacenterdynamics.com/en/videos/dcd-studio-manufacturing-power-systems-with-michael-beagan-tes-power</link>
<pubDate>Wed, 14 Oct 2026 16:27:27 GMT</pubDate>
<description>The discussion covers the importance of switchgear, power distribution, and modular power solutions for accelerating data center construction. (Data Center Dynamics)</description>
</item>
<item>
<title>Google data center strategic sourcing exec heads to OpenAI</title>
<link>https://www.datacenterdynamics.com/en/news/google-data-center-strategic-sourcing-exec-heads-to-openai</link>
<pubDate>Tue, 13 Oct 2026 16:26:47 GMT</pubDate>
<description>Google's strategic sourcing executive is joining OpenAI to focus on high-speed interconnects and rack power infrastructure. (Data Center Dynamics)</description>
</item>
<item>
<title>DCD Talk: Critical power architectures for AI data centers with Mehdi Rajehi, ABB</title>
<link>https://www.datacenterdynamics.com/en/videos/dcd-talk-critical-power-architectures-for-ai-data-centers-with-mehdi-rajehi-abb</link>
<pubDate>Tue, 13 Oct 2026 09:42:31 GMT</pubDate>
<description>ABB's Mehdi Rajehi discusses how next-generation power architectures are being designed to support the scaling requirements of AI data centers. (Data Center Dynamics)</description>
</item>
<item>
<title>Sponsored: VEIR raises $110 million Series C to accelerate commercialization of superconducting power delivery technology for AI data centers</title>
<link>https://www.datacenterdynamics.com/en/product-news/veir-raises-110-million-series-c-to-accelerate-commercialization-of-superconducting-power-delivery-technology-for-ai-data-centers</link>
<pubDate>Tue, 13 Oct 2026 08:00:00 GMT</pubDate>
<description>Veir raised $110 million in Series C funding to scale the manufacturing and deployment of superconducting power delivery systems designed for high-density AI data centers. (Data Center Dynamics)</description>
</item>
<item>
<title>Number of data center fires and power failures has doubled since 2024</title>
<link>https://www.datacenterdynamics.com/en/news/number-of-data-center-fires-and-power-failures-has-doubled-since-2024</link>
<pubDate>Mon, 12 Oct 2026 10:14:22 GMT</pubDate>
<description>Data from the Energy Incident Register shows a significant increase in fire and power failure incidents related to power infrastructure since 2024. (Data Center Dynamics)</description>
</item>
<item>
<title>Sponsored: Wärtsilä, Schneider Electric, and Stanley Consultants launch coordinated approach for faster US data center power delivery</title>
<link>https://www.datacenterdynamics.com/en/product-news/w%C3%A4rtsil%C3%A4-schneider-electric-and-stanley-consultants-launch-coordinated-approach-for-faster-us-data-center-power-delivery</link>
<pubDate>Sat, 10 Oct 2026 07:00:00 GMT</pubDate>
<description>Wärtsilä, Schneider Electric, and Stanley Consultants have launched a collaborative model to streamline data center power infrastructure delivery by integrating onsite generation and electrical engineering services. (Data Center Dynamics)</description>
</item>
<item>
<title>Breaking the AI Infrastructure Power Wall: From Grid to xPU</title>
<link>https://www.eetimes.com/breaking-the-ai-infrastructure-power-wall-from-grid-to-xpu</link>
<pubDate>Thu, 08 Oct 2026 12:36:33 GMT</pubDate>
<description>The report discusses the critical infrastructure requirements for AI hardware, specifically focusing on the electrical grid, power transformers, and the shift toward high-voltage DC architectures and onsite power generation. (EE Times)</description>
</item>
<item>
<title>FERC rejects ComEd’s cancellation of PowerHouse Hillwood data center contract</title>
<link>https://www.utilitydive.com/news/ferc-exelon-comed-powerhouse-hillwood-data-center/831127</link>
<pubDate>Wed, 23 Sep 2026 13:45:55 GMT</pubDate>
<description>FERC scrutinized a low letter of credit provided for a large planned 1.8-GW data center contract by PowerHouse Hillwood. (Utility Dive)</description>
</item>
<item>
<title>NVIDIA Announces DSX Ready Qualification Program for Data Center Power and Cooling Hardware</title>
<link>https://www.servethehome.com/nvidia-announces-dsx-ready-qualification-program-for-data-center-power-and-cooling-hardware</link>
<pubDate>Tue, 22 Sep 2026 15:00:58 GMT</pubDate>
<description>NVIDIA launched the DSX Ready program, a qualification standard for data center power and cooling hardware used in AI data center construction. (ServeTheHome)</description>
</item>
<item>
<title>Kodiak Gas Services to supply 76MW of behind-the-meter gas power to West Texas data center</title>
<link>https://www.datacenterdynamics.com/en/news/kodiak-gas-services-to-supply-76mw-of-behind-the-meter-gas-power-to-west-texas-data-center</link>
<pubDate>Mon, 21 Sep 2026 15:16:10 GMT</pubDate>
<description>Kodiak Gas Services will provide 76MW of natural gas-fueled power directly to a data center in West Texas. (Data Center Dynamics)</description>
</item>
<item>
<title>Wiwynn chair says AI hardware is being reshaped by power, cooling, interconnect demands</title>
<link>https://www.digitimes.com/news/a20260921PD201/cooling-hardware-wiwynn-taiwan-infrastructure.html</link>
<pubDate>Mon, 21 Sep 2026 03:04:23 GMT</pubDate>
<description>AI infrastructure demands are reshaping global hardware design, forcing focus on power, cooling, and high-speed interconnect solutions. (DigiTimes)</description>
</item>
<item>
<title>Pricing future megawatts: the growing role of earnouts in data center M&amp;A</title>
<link>https://www.datacenterdynamics.com/en/opinions/pricing-future-megawatts-the-growing-role-of-earnouts-in-data-center-ma</link>
<pubDate>Sun, 20 Sep 2026 10:27:00 GMT</pubDate>
<description>The article discusses the increasing use of earnouts in mergers and acquisitions (M&amp;A) concerning data center power capacity. (Data Center Dynamics)</description>
</item>
<item>
<title>Change 4 mindsets to build a more resilient US grid: NERC CEO Jim Robb</title>
<link>https://www.utilitydive.com/news/grid-infrastructure-transmission-data-center-ai-nerc-robb/829592</link>
<pubDate>Tue, 15 Sep 2026 14:49:27 GMT</pubDate>
<description>NERC CEO Jim Robb argues that building new power infrastructure requires overcoming ingrained mindsets, not just dealing with physical challenges. (Utility Dive)</description>
</item>
<item>
<title>Taiwan's Ministry of Economic Affairs shares power grid experience at APEC Energy Ministerial Meeting</title>
<link>https://www.digitimes.com/news/a20260914PD247/taiwan-apec-moea-industrial-development.html</link>
<pubDate>Tue, 15 Sep 2026 03:57:19 GMT</pubDate>
<description>Taiwan shared its strategy for maintaining stable power supply to support high-tech industrial growth, particularly in response to AI and global energy shifts. (DigiTimes)</description>
</item>
<item>
<title>AI server exports to US slow; electronics parts jump 1.5 times in August</title>
<link>https://www.digitimes.com/news/a20260910PD202/exports-taiwan-electronics-2025-ai-server.html</link>
<pubDate>Sun, 13 Sep 2026 00:23:08 GMT</pubDate>
<description>Taiwan reported that electronic parts exports reached a record high of $32.22 billion in August 2026, with integrated circuits and printed circuit boards seeing significant growth. (DigiTimes)</description>
</item>
<item>
<title>Taiwan sees AI-era power upgrade openings in France</title>
<link>https://www.digitimes.com/news/a20260911PD231/taiwan-france-europe-president-demand.html</link>
<pubDate>Sat, 12 Sep 2026 01:13:31 GMT</pubDate>
<description>Taiwanese companies are exploring energy and power infrastructure upgrades in France through trade delegations focused on grid security and energy resilience. (DigiTimes)</description>
</item>
<item>
<title>Pennsylvania PUC to consider ratemaking, ROE and curtailment as data center load grows</title>
<link>https://www.utilitydive.com/news/pennsylvania-puc-to-consider-rates-and-curtailment-as-data-centers-grow/830174</link>
<pubDate>Fri, 11 Sep 2026 14:57:52 GMT</pubDate>
<description>The Pennsylvania Public Utility Commission is considering rate adjustments, Return on Equity (ROE), and load curtailment due to rising electricity demand from data centers in the PJM region. (Utility Dive)</description>
</item>
<item>
<title>DCD Talks: Powering US data center growth beyond the traditional grid with David Bosco, PROPWR</title>
<link>https://www.datacenterdynamics.com/en/videos/dcd-talks-powering-us-data-center-growth-beyond-the-traditional-grid-with-david-bosco-propwr</link>
<pubDate>Fri, 11 Sep 2026 09:39:32 GMT</pubDate>
<description>US data centers are increasingly looking towards behind-the-meter power sources due to escalating grid constraints. (Data Center Dynamics)</description>
</item>
<item>
<title>ERCOT load continues to reach record highs</title>
<link>https://www.utilitydive.com/news/load-ercot-record-highs-eia/829801</link>
<pubDate>Tue, 08 Sep 2026 15:10:42 GMT</pubDate>
<description>ERCOT has reported that weekly average peak loads have exceeded previous records for over six weeks. (Utility Dive)</description>
</item>
<item>
<title>EnerNex: large loads, new rules</title>
<link>https://www.utilitydive.com/spons/enernex-large-loads-new-rules/829232</link>
<pubDate>Tue, 08 Sep 2026 09:00:00 GMT</pubDate>
<description>The growing demand from AI mega-campuses is forcing revisions in grid planning and highlighting the constraints of conventional engineering studies. (Utility Dive)</description>
</item>
<item>
<title>Half the supplier bench, a sixth of the coverage</title>
<link>https://gridtochip.site/blog/coverage-versus-the-bill-of-materials</link>
<pubDate>Mon, 07 Sep 2026 00:00:00 GMT</pubDate>
<description>Cooling, power distribution and generation hold 43% of this catalog's supplier placements and drew 16% of three weeks of trade coverage.</description>
</item>
</channel>
</rss>